This project is to redesign the feeder duct bank out of the 12kV substation and replaces aging electric cables and switches.
This is a proposed project in the Utility CIP electric budget for FY 2021 to 2025. The engineering design has been completed and construction is planned to begin in Fall 2024.
Colorado Distribution Feeder Outlets Project Map(PDF, 188KB)
Electric Engineering Department
General Inquiry: (650) 566-4500
Contact: Jim Pachikara
Phone: (650) 566-4532
Email: Jim.Pachikara@paloalto.gov
Contractor Name: MP Nexlevel