Fire Station No. 4 was built in 1953 and located at 3600 Middlefield Road. The existing fire station building does not serve the current needs of the Fire Department and does not effectively use the current 0.6-acre portion of the property. City Council included the replacement of Fire Station No. 4 in the Infrastructure Plan approved in June 2014. This project will provide a new facility built to current essential services standards with a high likelihood of being fully operational during and after a major disaster such as a significant earthquake.
The proposed fire station will be a building code compliant essential services facility for emergency response. The project will consist of the following components:
The new fire station will also be designed for LEED Silver certification and meet City adopted building code standards by having an all-electric design for new construction.
The project is divided into 3 phases: Schematic Design, Final Design and Construction Documents, and Construction. Community outreach will take place during Schematic Design.
The contractor completed the pour for the concrete footings, installation of underground utilities, and pour for the concrete shear walls. Construction activities following the shear wall pour include installing under slab plumbing and electricals, and construction concrete mockups.
The Temporary Fire Station No. 4 at Cubberley Community Center is complete, and the crew moved into the temporary station. This temporary station will serve as the Fire Department’s home for up to the next two years, while construction is underway for the new station.
Project Creation
Solicitation for Design
Design Phase
Construction Phase
October 20, 2025 - Council approval of Beals Martin and Associates construction contract for Fire Station No. 4 Replacement Project.
December 2025 & January 2026 Monthly Report(PDF, 896KB)
February 2026 Monthly Report(PDF, 727KB)
March 2026 Monthly Report(PDF, 1MB)
BRW Architects Preliminary ARB Review Presentation - February 16, 2023(PDF, 4MB)
Fire Station 4 Proposed Design Rendering Video
Approved Fire Station No. 4 Project Plans
Fire Station No. 4 Exercise Room Design Plans for ARB Ad-hoc Committee
Public Art Commission (PAC) Staff Report – October 20, 2022
Architectural Review Board (ARB) Staff Report – February 16, 2023
PAC Staff Report - March 16, 2023(DOCX, 36KB)
ARB Staff Report - August 3, 2023
ARB Staff Report - September 21, 2023
City Council Staff Report: Approval of Purchase Order with Mobile Modular Management Corporation - March 4, 2024
City Council Staff Report: Approval of Construction Contract with Beals Martin and Associates - October 20, 2025
3600 Middlefield Road, Palo Alto, CA 94303 View Map
3600 Middlefield Road , Palo Alto, CA 94303
Public Works Engineering Services (650) 329-2295 pwecips@paloalto.gov
Gain status updates and construction news.
Sign Up