Industrial Waste Discharge Permit

This permit is required for any significant discharge of industrial wastewater to the sanitary sewers. Discharges may stem from production, manufacturing, research and development, groundwater remediation, or process operation.

This permit is issued by the Regional Water Quality Control Plant for facilities located in East Palo Alto Sanitary District, Los Altos, Los Altos Hills, Palo Alto, and Stanford. Facilities located in Mountain View are permitted by the City of Mountain View.

Application How to apply Permit term
Industrial Waste Discharge Permit Application.pdf(PDF, 305KB) Contact the Pretreatment Program at (650) 329-2122, or email pretreatment@paloalto.gov to schedule a quick survey to determine if you need this permit before submitting the application.

 

5 years

How to submit your application via mail or drop box

Only hard copy applications are accepted. They must be either mailed or dropped off.

To submit hard copy applications, checks, or reports for your permit request, mail them to Pretreatment Program, 1900 Embarcadero Road, Suite 205, Palo Alto, CA 94303. You may also drop them off at the Palo Alto drop box at 1900 Embarcadero Road as shown below.  

Dropbox Location.png

 

Public Notice: Industrial Waste Discharge Permit Issuances

The companies listed in the table below have Industrial Waste Discharge Permits (Permit) that will be issued soon. These Permits allow them to discharge industrial wastewater to the City of Palo Alto sanitary sewer system and ultimately to the Regional Water Quality Control Plant for treatment.

Company

Facility Address Estimate Permit Issuance Date Permit Expiration Date 
Stanford Healthcare 300 Pasteur Drive  4/16/2026 4/15/2031
Stanford School of Medicine (Off-Campus)
  • 855 S. California Avenue
  • 1651 Page Mill Road
  • 1701 Page Mill Road
  • 2370 Watson Court
  • 3373 Hillview Avenue 2nd floor
  • 1050 Arastradero Road
  • 3176 Porter Drive (new in 2026)
  • 3174 Porter Drive
  • 3172 Porter Drive
  • 3165 Porter Drive
  • 3155 Porter Drive
 7/28/2026 7/27/2031
Stanford School of Medicine (On-Campus)
  • Grant: 300 Pasteur Drive
  • Alway: 300 Pasteur Drive
  • Lane: 300 Pasteur Drive
  • Edwards: 300 Pasteur Drive
  • BMI: 240 Pasteur Drive
  • Falk: 870 Quarry Road
 9/1/2026 8/31/2031
City of Palo Alto Landfill 2380 Embarcadero Road  4/1/2026  3/31/2031
Hammon Plating Corporation 90 Commercial Street  7/16/2026  7/15/2031
SRI International 3333 Coyote Hill Drive  8/1/2026  7/31/2031

 

This notice is posted in compliance with Section 16.09.080(h) of the Palo Alto Sewer Use Ordinance. Interested parties and other members of the public may comment on the issuance of a permit within 45 days of issuance by emailing Pretreatment@PaloAlto.gov. The permit effective date shall not be postponed solely because of the submittal of comments. However, comments shall be considered by the Director for incorporation into future permit modification(s).